Tuesday, November 6, 2012

Dirt work and Day 1 of Framing

I didn't get many good pictures of the dirt work loaded, because it was getting dark and I had supper ready when the guys were finishing up.
 fill in behind the gargage (above and below)
 Fill in behind the wing wall
 The hill sloping down (the masterpiece of the dirt moving!)
 Monday morning the framing crew was there a few minutes before 7:00.  We were pleased with the work they got done!  Below is the stairwell to go to the basement.
 Lance and Shelby in the basement bedroom
 Lance is in the closet!  The bathroom is off to the side and then the "utility" room and entrance to old basement.
 They also got 2/3 of the floor joices set before quitting time.   
It will be neat to see what they get done on day 2.  They were at the house at 7:00 am to get going again!

Monday, November 5, 2012

Chaos

Starting this addition construction process has unleashed chaos among the Hofmann house. All was going fine and dandy....until the last concrete truck came to finish up the garage floor.  That truck caught our electric line and pulled it off the house.  The electric backfed into the house, which is the equivalence of the surge like getting struck by lightening.  The surge fried our microwave, oven, internet router, Wii, DVD player, indoor TV antenna.  This has meant the chaos beyond the typical everything being out of place and sandy mud everywhere. 

Basically, there was not a lot of "progress" made last week.  They finished up the concrete and have been measuring for the wood package and waiting for the concrete to cure.  Saturday, Lance and Stanley fell the last 2 of the trees we are losing for the project.  The oak and cedar were in the way for the garage. 
 Saturday the weather was nasty to work outside, so the guys waited until Sunday to start backfilling.  They cut the mound of dirt in half!
 Friday, the first of the wood package started to arrive.  We have 2 semi loads of wood sitting around the yard.  Good thing is the framing crew was at the house before I left this morning at 7am!
I am sure when I get home tonight there will be a notciable difference around there!  I cannot wait!

Sunday, October 28, 2012

Sunday Snapshots

I asked Lance to take a couple pictures before church this morning.  Jenna, Shelby and I all cordinated.


Friday, October 26, 2012

Five Fun Friday Fotos!

My roses are blooming and beautiful right now!
 I cannot explain it, but I love this picture of Shelby!
 With all the construction, there is a lot of dirt, the girls were sliding down the dirt pile last night.
 Needless to say, there are lots of dirty clothes around here!
 Yes, that is our cat, wearing a pink dress, sitting in the laundry basket, highly ticked.  No, I do not know why, but I do know who did it and all I am going to say is she thought it was funny.


Wednesday, October 24, 2012

Taking Shape

For those of you who tried to watch the video of Jenna on the last post, I think I have it fixed now.  

I am trying to keep everyone updated on the progress of the house.  Sorry if you get tired of hearing about it, but we are excited.  Monday forms went up, Tuesday more forms went up and concrete was poured, Wednesday the forms came down. 

Tuesday -forms filled with concrete (looking SW)
Wing walls and basement wall - Forms with concrete (looking E)

 Wing Wall
 Wednesday forms came down.  This is the garage (looking W)
 Whole project (looking N)
 Basement wall (looking NE) tarp is coving existing basement entry.  Mom & Dad or Carla & Matt or for those of you who would like to visit, the stakes in the gravel is the guest bedroom and bathroom.
 Basement wall which will have the stairs (looking SW)

If everything goes as planned, we will have a visit from the plumber, get additional gravel tomorrow and get ready to pour the basement and garage floors on Friday (or Monday if it rains).  Either way, the project is really starting to take form! (no pun intended)