We continue to make progress daily around our house! Friday we got the 4 garage doors installed.
The truck fits in the first bay, but just barely. The laundry room and garage entry to the house make it a less than desirable fit.
The garage is serving as storage to left-over lumber, siding, doors, and electrical fixtures at the moment.
The elelctrician has been working very hard. We have 2 working lights in the new part at the moment. They run off the switch that used to control the back porch light.
The new fuse box.
The re-located light switch for the existing basement.
Both bathroom fans are installed.
The plumbing has wrapped up too. This is our injecter pump.
And our new hot water heater and lines running from the hot water heater!